As part of the “Power Grid Network Strengthening Project” under the Power Grid Company of Bangladesh (PGCB), our scope of work features the Supply and Laying of Graveling Work for the Kaliganj 132/33 KV AIS Substation.
This critical infrastructure enhancement improves substation safety, insulation, and operational efficiency, contributing to a more stable and resilient power grid network for the future.