Supply and Laying of Graveling Work for Kaliganj 132/33 KV AIS Substation
Main Contractor: CCCE-ETERN-FEPEC Consortium
Sub-Contractor: ALVEE CONSTRUCTION/VISIONTECH ENGINEERING LTD.
Client: POWER GRID BANGLADESH PLC
Contract No.: PGCB/GtoG/01,
Date: 10th October 2016.
Location: Kaligonj, Jhenaidah
Contract Value: 10,600,000.00
- Visiontech
Supply of Materials: Procuring high-grade, graded gravel/stones compliant with technical specifications for high-voltage substation yards.
Laying Work: Precise spreading, leveling, and compaction of gravel layers within the 132/33 kV AIS Substation yard to maintain insulation safety, proper drainage, and prevent weed growth.
Quality Assurance: Adherence to strict PGCB safety standards, environmental guidelines, and engineering benchmarks set by the main contractor consortium.
The Power Grid Network Strengthening Project is a vital initiative to upgrade and stabilize Bangladesh's national power transmission network. The meticulous execution of graveling works at the Kaliganj Substation ensures optimal safety, operational reliability, and longevity of critical electrical equipment.